PLAN AND SUCCESSFULLY IMPLEMENT PROJECTS
from A to Z
PROJECT PLANNING
We would like to make you a fair & transparent offer and become your long-term partner.
1. Contact & Visit
Already during the first visit, all necessary parameters are recorded and the entire wastewater situation is presented.
2. Experiments
After sampling, the preliminary tests for analysis are carried out in our in-house laboratory.
3. Planning & Quotation
Only when all results have been evaluated is a targeted offer made. This is followed in most cases by an on-site test.
4. Award of Contract
Only when the last pipeline has been planned does production begin at WAP GmbH.
5. Commissioning
The complete plant is assembled by our own assembly personnel at the Sinzig/Rhine plant and can be inspected by our customers.
6. Maintenance & Service
All systems that leave our factory are equipped with a MODEM / INTERFACE to enable remote maintenance.
PROJECT EXCERPT
01
Smurfit Kappa
Corrugated board plant in Kreuzau
FILTRATION
Fully automatic using a decanter / chamber filter press
Throughput: up to 2.5 m³/h
PROCEDURE
flocculation process
PROJECT
Treatment of flexographic printing waste water